Energia Renewables
Operational Wind Farms
Select the wind farm from the list below to find out more information on each of our operational wind farms.
Operational Wind Farms
Find out more about each operational wind farm below:
Altamuskin, Eshmore & Gortfinbar Wind Farms, Co. Tyrone
These 3 County Tyrone wind farms have a combined annual community benefit fund of over £100,000.
Clondermot Wind Farm, Co. Derry
Clondermot wind farm has been operational since 2015 and consists of one Enercon E70 turbine, generating 2.3 MW at maximum output.
Cornavarrow Wind Farm, Co. Tyrone
Cornavarrow Wind Farm Co. Tyrone
Cornavarrow wind farm has been operational since 2018 consists of 12 GE 3.2 turbines and a total capacity of 38.4 MW.
Derrysallagh Wind Farm, Co. Sligo
Derrysallagh wind farm has been operational since 2020 and consists of ten GE 3.2 MW turbines with a total capacity of 32 MW.
Drumlins Park Wind Farm, Co. Monaghan
Drumlins Park wind farm has been operational since 2024 and consists of 8 wind turbines, generating up to 49 MW of renewable energy.
Glenbuck Wind Farm, Co. Antrim
Glenbuck has been operational since 2017. This 9.2 MW wind farm in North Antrim consists of 4 Enercon E82 turbines.
Hollyford Wind Farm, Co. Tipperary
Energia's Hollyford wind farm has been operaitonal since 2014 and consists of 3 Siemens SWT-3.0-101 turbines.
Lisglass Wind Farm, Co. Antrim
Lisglass wind farm has been operational since 2015 and consists of one Enercon E70 turbine, generating 2.3MW at maximum output.
Long Mountain Wind Farm, Co. Antrim
Long Mountain wind farm has been operational since 2017 and consists of 12 Enercon E70 turbines.
Meenadreen Wind Farm, Co. Donegal
Meenadreen Extension has been operational since 2017 and consists of 38 Nordex N90 2.5MW turbines with a total capacity of 95 MW.
Rathsherry Wind Farm, Co. Antrim
Rathsherry wind farm has been operational since 2018 and consists of 9 Enercon E82 turbines.
Slieveglass Wind Farm, Co. Tyrone
Slieveglass has been operational since 2018 and consists of 3 Enercon E70 turbines.
Teiges Wind Farm, Co. Fermanagh
Teiges wind farm has been operational since 2018 and consists of 5 GE 2.5 turbines with a total capacity of 12.5 MW.
Thornog Wind Farm, Co. Tyrone
Thornog wind farm has been operational since 2015 and consits of 8 Nordex N90 turbines and has a total capacity of 20 MW.